The fourth week I started painting the superstructure and worked on the forward mast assembly. This required a lot of work with numerous photo etch details. I also had to scratch build a platform that sits atop the forward mast assembly.
With the upper platform made I am now working on the aft mast assembly. Once this is done I need to start building the mid-ship cranes and detailing the launches.
You can see all the photos and details from the start in the build log at: 1/426 USS Arizona BB-39
